Drop Ceiling Installation at Boys and Girls Republic – A Game-Changer for the Sports Hall
- qeti gochia
- Oct 23, 2022
- 2 min read
Updated: Apr 10

At Gamtani Construction Corporation, we take pride in delivering high-quality ceiling solutions that enhance both aesthetics and functionality. Recently, our team had the opportunity to transform the sports hall at Boys and Girls Republic, located at 888 East 6th St, Manhattan, NY, with a brand-new drop ceiling installation.
This project required precision, efficiency, and high-quality materials, and we successfully completed it in just 5 days—a testament to our expertise and commitment to excellence.
Project Overview
• Client: Boys and Girls Republic
• Location: 888 East 6th St, Manhattan, NY
• Surface Area: Sports Hall
• Ceiling Type: Drop Ceiling
• Materials Used: Armstrong, USG
• Project Duration: 5 Days
The Challenge: Enhancing a Busy Sports Facility #Drop Ceiling Installation at Boys and Girls Republic – A Game-Changer for the Sports Hall
A sports hall is a dynamic environment that requires durable and high-performance construction materials. The existing ceiling was outdated and worn, which affected both the acoustics and lighting within the space. The goal of this project was to create a modern, efficient, and visually appealing drop ceiling that would:
Improve sound absorption for better acoustics
Enhance lighting efficiency with well-integrated fixtures
Provide a clean, professional finish that elevates the space
Ensure long-term durability with top-quality materials
Our Solution: High-Quality Materials & Expert Craftsmanship
For this project, we used premium ceiling tiles and grid systems from Armstrong and USG, two of the most trusted brands in the industry. These materials offer superior fire resistance, sound control, and longevity, making them ideal for a high-traffic sports facility.
Our skilled team followed a strategic approach to minimize disruptions while ensuring the highest level of precision:
1. Preparation & Planning – We carefully assessed the existing structure and planned our installation to optimize efficiency.
2. Grid Installation – A strong and stable framework was created using a durable metal grid system.
3. Tile Placement – The drop ceiling tiles were meticulously fitted to ensure a seamless and polished look.
4. Final Touches – Integrated lighting and ventilation systems were adjusted to maximize functionality and aesthetics.
The Results: A Stunning Transformation
After just 5 days of work, the sports hall was completely transformed with a sleek, modern drop ceiling. The improved acoustics reduced noise levels, creating a more comfortable environment for sports and activities. Additionally, the new ceiling design helped distribute lighting more evenly, enhancing visibility and energy efficiency.
The management at Boys and Girls Republic was highly satisfied with the final outcome, praising our speed, professionalism, and attention to detail.
Looking for a Reliable Drop Ceiling Contractor?
If you’re planning a drop ceiling installation for a sports facility, office, retail space, or residential property, trust Gamtani Construction Corporation to deliver outstanding results.
Contact us today to discuss your project and get a free consultation!
Comentarios